MED-MFC Production and Monitoring
This site documents the MED-WAV production and delivery workflow operated by HCMR as a Production Unit (PU) of the Mediterranean Monitoring and Forecasting Centre (MED-MFC) for Copernicus Marine.
Products
| Product | Type | Delivery pattern | Target delivery time |
|---|---|---|---|
| MEDSEA_ANALYSISFORECAST_WAV_006_017 | NRT analysis + 10-day forecast | 2 cycles/day, 21 files/cycle | cycle 00: 20:00 UTC; cycle 12: 06:00 UTC |
| MEDSEA_MULTIYEAR_WAV_006_012 | Multi-Year reanalysis/interim | monthly interim delivery | by the 20th of each month |
The documentation deliberately separates current production behavior from planned changes. Monitoring and coordination must remain non-intrusive until validated in parallel with production.
Contents
- Architecture
- Current Production Workflow
- MDS Delivery and DNT
- JUNO Failover
- Monitoring and Status Model
- Dashboard and Event Log
- Remote Verification
- Incident Response
- Planned Changes
- November 2026 Transition
- Operations and Troubleshooting
Core principles
- Production remains autonomous if monitoring is unavailable.
- Observe before introducing control logic.
- Upload completion is not the same as successful ingestion.
- Future coordination must establish one authoritative owner per cycle.
- Events, checks, errors and final results should be retained as an auditable history.
- Credentials and secrets must not be stored in this documentation repository.